Payroll and materials come due weekly; the draw comes when the owner signs off. Apply in five minutes; funding can arrive in as little as 24 hours.
Apply Now →Round Rock straddles the Balcones Escarpment. East of I-35 the land is flat Blackland Prairie with dark, fertile soil, while the west side is hillier, karst-like terrain with thin topsoil that belongs to the Texas Hill Country. The city is about 15 miles north of Austin, had 119,468 residents at the 2020 census, and lies in Williamson and Travis counties.
For contractors, two kinds of ground means two kinds of jobs. Foundation, drainage and excavation work differs between the two sides, and so do the equipment and the time a job takes. Different job profiles also mean different timing between spending money and getting paid.
| Trade | Up-front spend | Typical wait |
|---|---|---|
| Concrete and site work | Equipment fuel, material, crew | Progress billing after inspection |
| Framing and finish carpentry | Lumber, trim, labor | Draw at milestone |
| Electrical, plumbing, HVAC | Fixtures and equipment, licensed labor | Payment after rough-in and final inspections |
Each trade carries the cost of the previous step while it waits for approval of its own. A late inspection on one trade delays pay on all the others behind it.
This is a made-up schedule to show the shape of the float, not a prediction. The contractor is out of pocket for about two months on a job that is going well.
A skid steer, trencher or work truck that breaks costs far more than the repair. It stops production, delays billing and can put the next job at risk. Owners who keep a rainy-day line avoid selling the next job short to pay for the last one. Our equipment financing page covers one approach and the business line of credit page another.
Many owners hold back a portion of each payment until the job is finished and accepted, and the contractor carries that held amount until closeout. On a profitable job it can be the difference between a good month and a tight one, because the crew and suppliers on the final stretch still need to be paid in full. When you plan a request, add retainage to your timeline. A job that looks healthy on paper may have tens of thousands of dollars sitting in someone else's account until punch-list items clear.
The same goes for change orders. Extra work is often done on a handshake before the paperwork is approved, which puts cost on your side of the ledger earlier than revenue on theirs. Getting the change order signed first is the cheapest form of cash management there is, and funding is the backstop when the signature takes longer than the work.
Funding runs from $25,000 to $5,000,000, with a five-minute application and a soft credit pull. Sole proprietors, including solo trades, can apply. Funding can arrive in as little as 24 hours. Learn about working capital in Round Rock or apply now.
It can change job cost and schedule, which changes the float. Size the request to your actual payroll and materials before the first payment.
Yes. Sole proprietors can apply.
Materials, payroll, equipment and vehicles, and insurance or permit costs are common uses.
Bridging the weeks between a milestone and its payment is one of the most common reasons contractors apply.
As little as 24 hours after approval.
Three months of business bank statements and a 5-minute application. FICO 500+ considered. $25,000 to $5,000,000, funded in as little as 24 hours.
Apply Now →It takes about two minutes and it will not affect your credit score.
No obligation • No impact to your credit score